
Scraps Grab Overhead Crane
This grab overhead crane is the key device for bulk material loading & unloading and transportation used in power plant, stockyard, workshop, port and other places; for example, the scrap grab overhead crane for steel plant or fabrication factory, the garbage grab crane is widely used in the garbage feed system of different kinds of Garbage-Cremation Power Plant in modern city.
This grab overhead crane is the key device for bulk material loading & unloading and transportation used in power plant, stockyard, workshop, port and other places; for example, the scrap grab overhead crane for steel plant or fabrication factory, the garbage grab crane is widely used in the garbage feed system of different kinds of Garbage-Cremation Power Plant in modern city. Our grab overhead crane is designed and produced strictly for lifting and conveying thus to ensure the normal work of the power plant, this crane could be controlled by hand, semi-automatically or totally automatically. The grab Overhead crane is a heavy duty crane, the working duty is A6~A8.
For the scraps grab Overhead crane
Rated Capacity | T | 5t | 10t | 16t | 20t | |
Span | m | 10.5-31.5m | ||||
Speed | Lifting | m/min | 40.1 | 40.7 | 41.8 | 48.6 |
Traversing | 44.6 | 45.6 | 43.2 | |||
Length Traveling | 93.7/86.4 | 76/89 | 89/87.3 | 87.3 | ||
Operational Model | Cabin; remote control | |||||
Grab Volume | CBM | 1 | 1.5 | 3 | 5 | |
Working Duty | A6 | |||||
Steel track recommended | 43kg/m or QU70 | |||||
Crane Power Source | 3P 380V, 50Hz or as demands | |||||
Control voltage | 24/36/48V DC |
Quality, Professional and Good service
1. Strictly Quality Management System,
2. Experience R&D team, skilled workers and Professional QC team.
3. Advance manufacturing and detective equipment
4. All top band parts: Siemens, Flender, Tailong, Chint, Yaskawa, Schnerder and so on.
5. Good packing
6. Timely delivery time
7. Reasonable shipment and installation service
8. Local after-sales service